Go to the first page of this Forum. The first entry has the link to the 9/5/2022 Build Week spreadsheet. Click it and enter your data. As of right now, there are 71 Broncos with their data engtered. After entering the data you can check out the various charts, its pretty cool.I've read several threads but never posted. Ordered an Outer Banks, 2.7, high package, hard top on 10/15/21. Was moved from 8/29 to 9/5. Blend date was 9/6. Build date was 9/8. Waiting on shipping. I don't know how to enter information on spreadsheet. Also wanted to see if anyone knows what "ramp one RA6K" means on the window sticker. I figure it means shipping by rail but can't find where that yard is located. tia
The Tear Tag is related to the ECU programming. It can be used later to reprogram a ECU if it needs to be replaced. That code will actually be printed on the corner of your ECU label. Notice how NDZ4 tends to be used on the LUX package. Because all of these models have the same tech configuration. variations to the codes will come from the various tech configurations you have.I wish I knew, mine is NPC4. Anyone have any ideas what a tear tag means????
Do you know if the OBX has to go to mod shop for the step rails? Or does that happen on the line?So your blend date if 09/14/2022 (that is the day the body and chassis meet, it may take a couple of shifts to complete this process). Your Bronco is Number 1018 out of 1112 being built that day. After it is built, and assuming you don't have one that has to go to the MOD shop, it will "go live" when the mods pop (battery is plugged in and your Bronco is working correctly). Once all that happens, the tear tag is populated and it will be ready for shipment. Once it is in shipment it is up to the powers that be when it will arrive at your dealership.
If I'm not correct on something, someone please correct me!
Iām the same ramp and from Missouri also. So it makes sense.I've read several threads but never posted. Ordered an Outer Banks, 2.7, high package, hard top on 10/15/21. Was moved from 8/29 to 9/5. Blend date was 9/6. Build date was 9/8. Waiting on shipping. I don't know how to enter information on spreadsheet. Also wanted to see if anyone knows what "ramp one RA6K" means on the window sticker. I figure it means shipping by rail but can't find where that yard is located. tia
Ford couldnāt delay mine even though I wanted them to.I have never posted on here until now.... read so many posts tho i speak fluent frustration. looks like its finally happening. blend date of yesterday so maybe some modules poppin here in the next day or so. When I got my notification from ford on 8/19 i was like yeaahhh righht... but lets see if it actually goes through. i have a window sticker and a blend date, can I still get bumped or is that pretty set in stone?
no doubt in my mind.Ford couldnāt delay mine even though I wanted them to.
That said, if youāre anxious for yours itāll probably get bumped.
Just checked the tracker and it says shipped!!Iām the same ramp and from Missouri also. So it makes sense.
great question and I wish I had an equally awesome answer! Iām going to take a guess and say no. If it did they were very quick about it lol. My blend date was Wednesday and the mods popped on Thursday and stated built. Got my built official email from Ford this morning with an ETA (which would be nice, it seems a little optimistic lol) of next Friday - the end of the following week.Do you know if the OBX has to go to mod shop for the step rails? Or does that happen on the line?