- First Name
- Chris
- Joined
- May 4, 2023
- Threads
- 0
- Messages
- 13
- Reaction score
- 14
- Location
- California
- Vehicle(s)
- 1969 Chevelle, 4 Dr Badlands ordered 3/27
- Your Bronco Model
- Badlands
Same situation here. Although I even got a follow up email when they moved my production date up to the week of June 5th then June 6th. Now the tracker shows confirmed with no date but the VIN is still present in the tracker. March 27th order badlands no sas, high with hard top, and tow. Bet something became a constraint again without notice.I didn't get the error email, but I did get a confirmation on 4/27 my bronco was scheduled for June 19 week production. The tracker reflected that scheduling info at the time. I checked a couple days ago and it now no longer says it's scheduled at all, it only lists it as order confirmed in tracking.
Sponsored
Last edited: