Vin and July 5th Build Date
Sponsored
NoCan you change to a soft top on a WT?
You think you are back if the pack? I reserved on Dec. 24.Not me...I’m at the back of the pack with my September reservation
Same here, interesting we're both in NJI got mine on 4/22 for 6/21 build. Last update was 7/5 build. Not sure if that is still an accurate date. 4 door with Lux. 7/13 reservation.
I'm rather curious about Wildtrak production...I have a pretty low spec 2 door Wildtrak as we only opted for the MIC top, Mid package cause we love the camo cloth seats and don't need a screen bigger than the 8" already on it and tube steps but those that opted for the Lux package with leather seats, 12" screen, tow package and all the bells and whistles are getting told to change their orders if they want an earlier delivery...but at this rate who knows. Some people that reserved later are already getting VINs so it just depends on whats available and what can be built right now.You think you are back if the pack? I reserved on Dec. 24.
I should have clarified that I have a Badlands on order. I was just making a general comment about place in line.I'm rather curious about Wildtrak production...I have a pretty low spec 2 door Wildtrak as we only opted for the MIC top, Mid package cause we love the camo cloth seats and don't need a screen bigger than the 8" already on it and tube steps but those that opted for the Lux package with leather seats, 12" screen, tow package and all the bells and whistles are getting told to change their orders if they want an earlier delivery...but at this rate who knows. Some people that reserved later are already getting VINs so it just depends on whats available and what can be built right now.