Congrats!Mods popped this morning! And got a built status in the pizza tracker.
I would like to dedicate this to @broncoSJ as they have inspired me to relentlessly check every day.
I was having the same issues as you 12/20 production date and radio silence elsewhere. There is hope!Congrats!
He ordered a Wildtrack. It's probably getting the finishing pieces that happen off the assembly line.How the f**k does that happen? Sorry, man. Iโd be so f***ing furious right now if I were you. Id be ready to strangle somebody with my hammock.
Just checked and had mods come in overnight. I was starting to think everyone on this forum was in on some kind of conspiracy, but there are ACTUAL MOD! Real deal mods! Also seeing the pt add a 1/04 date to the "In Production" bubble.
To quote a Miss Penny Lane.... It's all happening!
Some notes on this, my tear tag NEVER changed from DAA. It went straight from no communication except a 12/20 production date to built.Mods popped this morning! And got a built status in the pizza tracker.
I would like to dedicate this to @broncoSJ as they have inspired me to relentlessly check every day.
My MY22 2DR Mansquatch scheduled for 12/20 was built on 1/3Looking at the build worksheet and I don't see any Mansquatch's with their mods popped.
Yeah I realized you and mrxg78 are two mansquatch's that have been built. Guess there's no reason for mine being delayed now.My MY22 2DR Mansquatch scheduled for 12/20 was built on 1/3
Did your mods pop and show a "built" date yet.My MY22 2DR Mansquatch scheduled for 12/20 was built on 1/3
MODS popped (pages and pages) on the 4th and IN PRODUCTION said 1/3 and moved today to BUILT 1/4 .... I called my dealer yesterday who said his system showed my Bronco as built 1/3Did your mods pop and show a "built" date yet.
And my Tear Tag changes as well when the MODS poppedDid your mods pop and show a "built" date yet.