I started with a build date 12/20
12/27, 1/3, 1/10, 1/17, 1/24, 3/7 and now 3/14. 7 times so far!
My build: Base 4 door Race Red,
2.7, soft top, modular bumper, safari bar, auxiliary switches,
sasquatch, paint protection.
I'm guessing paint protection is holding me up!
12/27, 1/3, 1/10, 1/17, 1/24, 3/7 and now 3/14. 7 times so far!
My build: Base 4 door Race Red,
2.7, soft top, modular bumper, safari bar, auxiliary switches,
sasquatch, paint protection.
I'm guessing paint protection is holding me up!