Sponsored

Preview(?) and Priority Code

Brock9281

Outer Banks
Well-Known Member
First Name
Rob
Joined
Oct 26, 2021
Threads
67
Messages
616
Reaction score
320
Location
Atlanta
Vehicle(s)
F150
Your Bronco Model
Outer Banks
Hoping this means “Time of Preview” by Ford and Priority Code 10 is good! Hoping for a Nov production schedule

D49F04BA-4833-47DE-B81B-15B61A551A51.jpeg
Sponsored

 

Mean Red GT

Badlands
Well-Known Member
First Name
Kevin
Joined
Sep 7, 2021
Threads
21
Messages
796
Reaction score
1,276
Location
TN
Vehicle(s)
2022 4 Door Badlands/2016 Mustang GT PP
Your Bronco Model
Badlands
Clubs
 
I think all of the DORA documents have that "time of preview" and is basically when the order was submitted.
 

abe

Wildtrak
Well-Known Member
First Name
Abe
Joined
Jan 6, 2021
Threads
8
Messages
669
Reaction score
1,326
Location
Indiana
Vehicle(s)
16 F150 XLT 2.7 (sold 😥), 84 Chevy K5, 09 Chevy T
Your Bronco Model
Wildtrak
Clubs
 
Not sure if this what you mean, but 22s aren't getting built until mid-December.
 

drose1

Outer Banks
Active Member
First Name
Dean
Joined
Nov 30, 2020
Threads
6
Messages
32
Reaction score
70
Location
Denver
Vehicle(s)
Ford Escape
Your Bronco Model
Outer Banks
Clubs
 
What would be the difference between Priority Code 10 and Priority Code 19??
 
OP
OP
Brock9281

Brock9281

Outer Banks
Well-Known Member
First Name
Rob
Joined
Oct 26, 2021
Threads
67
Messages
616
Reaction score
320
Location
Atlanta
Vehicle(s)
F150
Your Bronco Model
Outer Banks
Not sure if this what you mean, but 22s aren't getting built until mid-December.
Correct, I’m hoping for a mid-Dec build. If that’s the case, is there a date when order should be updated with Scheduled for Production?
 

Sponsored

GroovyGhost

Outer Banks
Well-Known Member
Joined
Jul 13, 2021
Threads
0
Messages
233
Reaction score
334
Location
Minnesota
Vehicle(s)
2022 Bronco
Your Bronco Model
Outer Banks
Clubs
 
Correct, I’m hoping for a mid-Dec build. If that’s the case, is there a date when order should be updated with Scheduled for Production?
I haven't seen any way to know when Ford will build your order. As far as we've heard, codes 10-19 are all regular "ready to build" codes and I'm reasonably sure all order summaries say preview like that.

At this point, constraints like Lux, Tow, MIC, 2.7, and your reservation time stamp are likely to be more important. They seem to send out emails about production scheduling Thursday-ish.
 

abe

Wildtrak
Well-Known Member
First Name
Abe
Joined
Jan 6, 2021
Threads
8
Messages
669
Reaction score
1,326
Location
Indiana
Vehicle(s)
16 F150 XLT 2.7 (sold 😥), 84 Chevy K5, 09 Chevy T
Your Bronco Model
Wildtrak
Clubs
 
Correct, I’m hoping for a mid-Dec build. If that’s the case, is there a date when order should be updated with Scheduled for Production?
Might want to check this thread out. It gives a pretty good explanation.
https://www.bronco6g.com/forum/thre...ed-emails-delivery-date-estimates-more.24987/

Also, If you are a new order, prepare to wait a while. There are people that reserved in July 2020 that haven't received their Broncos yet. Soft top will increase your chances of getting built sooner rather than later. Of course, this is all dependent on a number of things- part constraints, dealer allocations, etc.
 

ZackDanger

Badlands
Well-Known Member
First Name
Z
Joined
Jul 8, 2020
Threads
23
Messages
6,451
Reaction score
28,975
Location
Massachusetts
Vehicle(s)
2021 Toyota 4Runner
Your Bronco Model
Badlands
Clubs
 
What would be the difference between Priority Code 10 and Priority Code 19??
Many MANY threads explaining this... but the short answer is:

When it comes to the Bronco, nothing. Absolutely nothing. Nada. Doesn't mean anything. All numbers between 10-19 are equal.
Sponsored

 
 


Top