Must be a NE thing7/14 6:00 am reservation. Nothing. Previewed once (what a tease). 2 dr SAS big bend.
Sponsored
Must be a NE thing7/14 6:00 am reservation. Nothing. Previewed once (what a tease). 2 dr SAS big bend.
Crickets. @Ford Motor CompanyJust out of curiosity. How many first 3 day reservation holders out there still haven’t received a build date? I am day 3 w/ 2dr badlands lux modular manual. Nothing for me. Hopefully tomorrow…
@Ford Motor Company @mrlevine and screw early adoptersEither
Shows dealer allocation is #1 priority
Do you have a build date then?use the backdoor look up that has been posted. use your reservation number and you should have some sort of estimate of a production date. im a day2/3 res but atleast i know somewhat my bronco is expected to be produced late Feb. 2/21/2022.
Nope. Don’t think that tells you anything useful if you haven’t been scheduled. At least all it tells me is that I’ve placed my order.use the backdoor look up that has been posted. use your reservation number and you should have some sort of estimate of a production date. im a day2/3 res but atleast i know somewhat my bronco is expected to be produced late Feb. 2/21/2022.
If you haven’t gotten a build date yet it won’t give you an idea. For most of us it is still in the ordering phase on the backdoor link.use the backdoor look up that has been posted. use your reservation number and you should have some sort of estimate of a production date. im a day2/3 res but atleast i know somewhat my bronco is expected to be produced late Feb. 2/21/2022.
Yep. Due to Ford changing the allocation method and then they did not allow us to change dealers, (even though they said we could), I'm locked in. Could go to another dealer (without taking my reservation) and order another Bronco. Who knows if that would be faster or slower? However, Granger has earned my loyalty with their honesty and communication. Therefore I wait. Ford really needs to get out from underneath the yoke of the dealership system. Their reputation depends upon it.Where is your position in line at granger? I bet it is outside their allocations which explains the no build date. Sucks though.
Reserved Day 2. Supposedly blended 1/4. Status only says, In Production.Just out of curiosity. How many first 3 day reservation holders out there still haven’t received a build date? I am day 3 w/ 2dr badlands lux modular manual. Nothing for me. Hopefully tomorrow…
Priority code applies to retail orders with no time stamp. They are the last priority they look at. #1 dealer allocation, #2 build constraints, #3 if you pass the above two, do you have a reservation time step and where does that put you in the line of orders from a given dealer #4 priority code, if you don’t have #3 and the dealer has allocation but no #2’s that can be built they start pecking away at #4 priorities to determine build order.Day 3 Badlands reservation, reordered a 2022. Changed to a soft top, but my place in my dealer’s line hasn’t moved in 3 months. No build date in sight.
Always wondered: how does dealer priority code play into the prioritization?
boom…..plenty of us left7/14 early morning, priority code 10, dead silence
originally a 2/14 production date.If you haven’t gotten a build date yet it won’t give you an idea. For most of us it is still in the ordering phase on the backdoor link.
^^7/14 early morning, priority code 10, dead silence