- First Name
- Barry
- Joined
- Jan 18, 2021
- Threads
- 10
- Messages
- 196
- Reaction score
- 414
- Location
- Cleveland Area
- Vehicle(s)
- Honda Accord
- Your Bronco Model
- Badlands
- Thread starter
- #1
Thought I'd start a thread for those of us stuck in purgatory. If you have a VIN, refused to change to a soft top, you're NOT a FE build and you're truck is NOT sitting at Dirt Mountain then I felt we needed a place for updates and information. My example: BL, 2.7L, 4DR, Squatch, MIC. Day 1 reservation, Day 1 order. Have had a VIN since May and have had my production week changed 5X. System still shows it as 8/30 (obviously not accurate). The way I understand it right now and correct me if I'm wrong: New tops out to trucks on the road first, New tops to trucks sitting in lot second, in parallel First Edition MIC's and everyone who converted to soft tops get rolling off the line at MAP and THEN if this group is lucky we're next up. Everyone agree or am I missing something? There's some vague language floating around in threads and maybe even in Ford announcement that if you had a VIN and a date you'd still get a 2021 even with a MIC but you'd be last in line for 2021. Anyways, thought I'd throw this out there for folks in this category on the off chance any of us start to see progress.
Sponsored