Where are you seeing there’s no EG?Its most likely the MY21s, which are a complete embarrassment to Ford at this point. Not a single Eruption Green in the bunch, which is by far the most popular my22 color
Sponsored
Where are you seeing there’s no EG?Its most likely the MY21s, which are a complete embarrassment to Ford at this point. Not a single Eruption Green in the bunch, which is by far the most popular my22 color
Congrats!I haven’t posted in awhile because frankly I’ve been too irritated. However this AM:
2 Dr, OB, 2.7
Original build week 1/17
This gives me some hope as our details are almost exactly the same re reservation, OG order, reorder, build (I don't have tow package, tho). However, I don't think there's any rhyme or reason to them pulling off of ice mtn. Congrats to you!My dealer emailed me this morning, "..Ford shows that your Bronco was released for shipment this morning at 0324 CT. The ETA is 4/13-4/19."!!!!!!
Haven't been able to get into the pizza tracker all day though to see if it confirms.
Early 7/14/20 reservation, 1/23/21 order, 10/15/21 re-order for MY22, scheduled for production week ofDec. 20thJan. 10thJan. 17th
OBX 2dr advanced, 2.7 auto, high pkg, tow pkg, roof rails, 4.27 locker
The very first Bronco in the video Is eruption green.There’s no EG in this holding lot which has the Bronco’s being rushed for completion by 3/31. Most likely my21s, although I dont see any AMB or Rapid red in the mix. There’s another thread about this
There was a lengthy response to this on this post on page 4 of the post Interesting go ahead and check it outHere is some more fun new info posted today in the chip hold lot post. Seemly with a local MI guy and ford employee. I ask for some clarification. What do you think this means?
Its always been easy to find your Bronco…..just,
“Tap That App”
your scheduled production was week of 1/19 and not receiving until next month? So 4 months? My dealer made it sound like 1 month from scheduling to receive.Mine moved to Built/In Transit status yesterday. EDD briefly shifted to 4/8 - 4/14, now back to 5/9 - 5/15 as of this morning. So who knows.
It went in production on/around 1/19/22, with an EDD of 2/15, then chip limbo like it did with so many others. Yesterday was the first update since that time, and it's still bouncing around. What's interesting is that despite the Built date, it still lists the chip hold as well. At this rate, if it actually shows in May I'll be thrilled.your scheduled production was week of 1/19 and not receiving until next month? So 4 months? My dealer made it sound like 1 month from scheduling to receive.
I’m assuming 1/21 was your blend date? What date does the tracker show for you as the actual “built” date?I just received E Mail from Ford that my Bronco is built and shipped. Scheduled delivery at my dealer is between 3/25 and 3/31.
2 Door Basesquatch, 2.7 with 0 options.
Initially was an order for a 21, deferred to a 22.
Reservation date: 7/14- early AM
Build week: 1/17
Build date: 1/21
Next we will see what the dealer is going to do (ADM), which will determine if I get it or not.
Kind of excited but all the wait and gas has skyrocketed so high that it cannot be my daily driver for my work commute. At least I will get to see it in person.