Fully loaded outer banks for me. Tow roof rails and micWhat’s your build? Trying to figure out if it’s still the tops or something else.
Sponsored
Fully loaded outer banks for me. Tow roof rails and micWhat’s your build? Trying to figure out if it’s still the tops or something else.
Oh shit I never thought of it that way. Dammit!That’s the rub - VIN holders are just as screwed as non VIN holders as far as ETA.. but the folks without VINs can change their orders etc while we are stuck holding.
Ford couldn’t screw this up more if they tried.
Just take chips and commodity restraint items off those vehicle and mail them to MAP.Going to Vegas opening day Off Roadeo .Maybe I’ll just steal one!
BD Manual 2 doorWhat’s your build? Trying to figure out if it’s still the tops or something else.
My theory is they realize the top situation hasn’t improved. So they’re going to only produce FEs (since they can’t build them in 2022) and soft top builds. What it looks like is they’re taking the tops from scheduled builds and giving them to FEs and bumping them up. That’s just what it looks like to me.Fully loaded outer banks for me. Tow roof rails and mic
I’m sorry to hear that, was it something other than covid? Must be tough being a ducktor these days! /sI know I usually put not being a dick my bad I forgot. I lost my patients with them a while ago. I stick around to get the scoop and chime in on things. I’ll be selling mine the day I get it.
From what I'm gathering in the forum discussions, Ford is giving more priority to the FE builds and moving production dates up, then pushing all others back!What’s your build? Trying to figure out if it’s still the tops or something else.
It was actually a bad case of shitty Molson apparently they use moose piss in it eh.I’m sorry to hear that, was it something other than covid? Must be tough being a ducktor these days! /s
Agreed but like they didn’t know this shit last week when they pushed it back?! Why do it again a few day later…unless they just like messing with us.From what I'm gathering in the forum discussions, Ford is giving more priority to the FE builds and moving production dates up, then pushing all others back!
I blame coorsIt was actually a bad case of shitty Molson apparently they use moose piss in it eh.
^^^ This is spot on ^^^My theory is they realize the top situation hasn’t improved. So they’re going to only produce FEs (since they can’t build them in 2022) and soft top builds. What it looks like is they’re taking the tops from scheduled builds and giving them to FEs and bumping them up. That’s just what it looks like to me.
The Rockys do go into Canada. Might not be able to spell but I know my geography’s.I blame coors
It’s horse shit, how the hell can they not have the top situation figured out. Ford turned everything and cranked out masks, face shields and, respirators for covid seemingly overnight. They can’t figure out how to make a decent top this late in the game. They’ve only been planning this for 5 years. What a joke.^^^ This is spot on ^^^