- Thread starter
- #121
is it correct?I did get the updated dora
Sponsored
is it correct?I did get the updated dora
Yesis it correct?
What seems to be the trend for builds picked up this week?I am a salesman, that handles all of the Bronco orders and most others models as well. I interact with WBDO daily.
all of the board it appears. I can only go off of what I have scheduled. Which was only 1. BL Mic, lux, sas and tow 2.7What seems to be the trend for builds picked up this week?
Then it was changed in the system. They did what you wanted them to do. What did you change from?
Had a 4DR Wildtrak hardtop with high package. Was quoted second half of MY23 as an estimate before this new slew of constraints were dropped.Then it was changed in the system. They did what you wanted them to do. What did you change from?
stay put, my rig configuration is similar to you, June order and today checked my order status, its scheduled for production, did not receive mail yet, but status changed in ford.com.Curious to see if any WTs get scheduled. I'm looking forward to @FordVideoGuy 's livestream tonight.
Went to my dealer yesterday and YES the non-SAS optioned wheel is done. I had to switch back to the stock wheel. Doesn’t really matter since I’m replacing with Black Rhino anyway. I hope this is the end of constraint removals. I did stick to MICI’ve reached out and we’ll see. Just one thing after another.
What are the optional wheels??correct. no Raptor, HE Everglades or Base series will be selected for scheduling. Nor will BL with the optional wheels.
HE, Base series and MT orders were the only ones scheduled the past 2 weeks.
My build date is 2/24 with Sasquatch i confirmed it with Ford making sure it was everything i ordered and nothing was changed by dealer.Does "optional wheels" include sasquatch packages wheels? Dealer is saying mine is showing a 2/6 build week.
MT Badlands with Sasquatch, MIC hard top, and high package build date of 2/24. I confirmed with fordMy MT Badlands just got moved to 3/27, wonder if any other MT builds got moved earlier.
I am scheduled 3/6 and I have a Badlands with the optional wheelcorrect. no Raptor, HE Everglades or Base series will be selected for scheduling. Nor will BL with the optional wheels.
HE, Base series and MT orders were the only ones scheduled the past 2 weeks.
Just in case you are interested.....MT Badlands with Sasquatch, MIC hard top, and high package build date of 2/24. I confirmed with ford