Email from Ford on 4/22 said my 2.7 non-sas BL was scheduled to be built the week of 6/14, and included a link that showed me a VIN and also listed the 6/14 build date. The link now says this: "Your order has been entered into the Ford Ordering System. It will then be scheduled and placed in the first available production week. Once scheduled, a Vehicle Identification Number (VIN) and estimated build date can be provided."
Sponsored