My base manual transmission is scheduled for build week March 6.
Sponsored
The thread was referring to new scheduling.My base manual transmission is scheduled for build week March 6.
I think this is where I am with Robert Horne Ford in Apache Junction. I've pressed for allocation numbers and they haven't given me that information. I assume I made a mistake ordering through them instead of giving business to one of the largest dealers in AZ.I still have my order in, but I started to lose hope I would ever get scheduled. Ended up leasing a Frontier Pro-4x for stupid cheap. My order is with Kearny Mesa and I just don’t think they have enough allocation for all their orders.
Oh well, I’ll reassess my options in 18 months.
Who?... I assume I made a mistake ordering through them instead of giving business to one of the largest dealers in AZ.
Robert Horne Ford. They've been friendly and professional, but I imagine an order at Bell, Sanderson or Earnhardt and I'd already have my vehicle. No way to know I guess.Who?
Other than Jones, Phoenix doesn't have any small dealerships. My Base took 19 months, but a soft top (non sasquatch) should have been built within a couple months of ordering.And yet, my black diamond 2.3l soft top doesn't get pulled. I have to wonder if my dealer just doesn't have allocation and won't tell me.
I believe so. I was July 18, 2020 and finally got a VIN on my 2 dr Badlands. I did drop Sas though. I figured take the money $2495 + $2500 and put it towards wheels/tires that I like. Seen a lot more from Stephens Auto Center that were old reservation holdersSo did most of the very old legacy orders get scheduled last week?