Sponsored

With latest delays, who is thinking of waiting to change order to Warthog?

DarienJim

Badlands
Well-Known Member
First Name
James
Joined
Oct 25, 2020
Threads
5
Messages
70
Reaction score
14
Location
Jupiter FL
Vehicle(s)
Lots
Your Bronco Model
Badlands
With the latest Friday announcement by Ford, most of the production of the so-called 2021 Bronco will actually now be in late Fall/early Winter and this will essentially be a 2022 model.

Given the new timing, and the expected announcement of a Warthog for 2022 production, anyone thinking of waiting? Or does this delay also signal a delay in the Warthog?

On latter Ford in my opinion needs to get something out soon to blunt Jeep’s new Wrangler.

‘Thoughts?
Sponsored

 

Dajosh

Badlands
Well-Known Member
First Name
Joshua
Joined
Sep 13, 2020
Threads
1
Messages
48
Reaction score
80
Location
Kent WA
Vehicle(s)
2015 Mustang GT 2018 Hyundai Tucson 1967 FJ40
Your Bronco Model
Badlands
We have no real time frame for the Warthog yet. That being said, if it get announced before we can actually buy the Bronco...
 

Hoofnmouth

Banned
Base
Banned
Banned
First Name
mark
Joined
Jul 10, 2020
Threads
16
Messages
1,979
Reaction score
4,081
Location
N ca
Vehicle(s)
ford focus st
Your Bronco Model
Base
Clubs
 
The warthog is gonna have a grey beard before any of us own one.
 

Lilj4425

Badlands
Well-Known Member
First Name
Jacob
Joined
Jul 16, 2020
Threads
85
Messages
4,258
Reaction score
18,665
Location
Greenville, SC
Vehicle(s)
2021 Badlands Bronco
Your Bronco Model
Badlands
I would wait if I thought the Warthog would be in my price range but I am fully expecting it to be at least $70,000.
 

DrewBronc21

Badlands
Well-Known Member
Joined
Jan 19, 2020
Threads
14
Messages
1,853
Reaction score
3,759
Location
New York
Vehicle(s)
2011 Subaru STi, 2018 Camry Hybrid
Your Bronco Model
Badlands
Since the Warthog will probably be 2x the price of my 2DR Basemansquatch, no I will not be changing order to Warthog
 

Sponsored

Walnut

Black Diamond
Well-Known Member
Joined
Jan 29, 2020
Threads
2
Messages
296
Reaction score
807
Location
Florida
Vehicle(s)
old ass beater
Your Bronco Model
Black Diamond
Clubs
 
all timelines have shifted so Warthog is delayed, too
 

Hopeless Diamond

Badlands
Well-Known Member
First Name
JR
Joined
Jul 30, 2020
Threads
35
Messages
854
Reaction score
2,445
Location
Chumstick, WA
Vehicle(s)
F350/2dr Rubicon/'96 4R/'75 Intl D150/'22 Badlands
Your Bronco Model
Badlands
Not necessarily by as much. Many of the same basic components are used and those are what are holding up the release now. They still are going through engineering and testing now, that is all done without the need for most of the suppliers involvement. While there may be interior differences, they are probably minor and mostly baked in at this point. It's mainly mechanical stuff they need to finalize which would include fewer outside vendors.
 

Bronco21fan

Black Diamond
Well-Known Member
First Name
Angelo
Joined
Jul 11, 2020
Threads
15
Messages
2,615
Reaction score
4,820
Location
NewJersey
Vehicle(s)
2021 bronco black diamond 2 door Sasquatch
Your Bronco Model
Black Diamond
Clubs
 
They need to get these things to us bye summer time so we can e joy them at the beach and in the nice weather
 

Treeza61

Well-Known Member
First Name
Richard
Joined
Jul 23, 2020
Threads
0
Messages
709
Reaction score
676
Location
Texas
Vehicle(s)
2017 F250, 2019 4Runner TRD Pro, 2013 FJ
Your Bronco Model
Undecided
With the latest Friday announcement by Ford, most of the production of the so-called 2021 Bronco will actually now be in late Fall/early Winter and this will essentially be a 2022 model.

Given the new timing, and the expected announcement of a Warthog for 2022 production, anyone thinking of waiting? Or does this delay also signal a delay in the Warthog?

On latter Ford in my opinion needs to get something out soon to blunt Jeep’s new Wrangler.

‘Thoughts?
I have no interest in the Warthog.
 

AzScorpion

Badlands
Well-Known Member
First Name
Dave
Joined
Oct 11, 2020
Threads
7
Messages
646
Reaction score
1,841
Location
Arizona
Vehicle(s)
2019 Ford Ranger SuperCrew Lariat 4x4
Your Bronco Model
Badlands
They way things are going I'll probably be 6' under by the time the Warthog is released. I'll take my chances waiting for my Bronco.
 

Sponsored

Broncocito

Well-Known Member
First Name
B
Joined
Aug 11, 2020
Threads
4
Messages
617
Reaction score
788
Location
NM
Vehicle(s)
2021 Tacoma TRD PRO Manual
Your Bronco Model
Undecided
Well, the Bronco is in a timeline flux. Time will tell; perhaps I will wait if timelines present themselves in a positive manner.
 

GaryB2220

Badlands
Well-Known Member
First Name
Gary
Joined
Jul 14, 2020
Threads
9
Messages
1,299
Reaction score
2,811
Location
Wellsboro PA
Vehicle(s)
'99 4runner, '10 Town & Country
Your Bronco Model
Badlands
Clubs
 
Too many ifs need to happen. If it is available as a2 door. If a manual transmission is available. If it isn't too expensive ($55k or less for 2 door manual) if Sasquatch is available. And if I can wait that long. I'll try. Otherwise, I'm without my own vehicle and sharing my wife's at the moment. Might have to buy a20yr old tacoma for a few hundred bucks to last me until then
Sponsored

 
 


Top