Does anyone know where the Order Confirmed date comes from? Got my VIN last Thursday but it says my order was confirmed on 12/05
Sponsored
Sounds very similar to my situation. I also have a 2 door on order with a few constraints, but have seen several similar, but significantly later orders, and orders with more constraints get scheduled. I even saw one that was the same option list exactly.I have a 2 dr, big bend, mid, SAS, with mod bumper. Yes some constraints but been seeing a lot of the same or higher level 2 dr builds with much later reservation or non reservations getting built. Also I have an excellent dealer who is on top of things and allocation is not the issue for the dealer either. So this is 100% on ford.
Your not the only one with a Jeep order in. Mine was placed 11/1. Let's go Toledo!Sounds very similar to my situation. I also have a 2 door on order with a few constraints, but have seen several similar, but significantly later orders, and orders with more constraints get scheduled. I even saw one that was the same option list exactly.
This is why I just put an order on a Jeep, guess I'll have to see which one gets scheduled first.
Admin edit:
To check order status using backdoor link:
Add your order number after the "=" in this link -
https://www.ford.com/buy/manage.html?reservationId=
Just got word my 2 door badlands manual sasquatch high package in race red is scheduled for production 3/28. Haven’t seen any similar builds produced yet, anyone have one in hand or scheduled?
Befuddling, isnt it?Damn my exact build only cyber orange. No vin day one reservation.
Congrats to you. But this is a little crazy I am an early morning day three res with this build an nothing. I even called Ford last night. So I guess I will try to stay pumped.My dealer called to tell me my 4 door badlands with pretty much every constraint (mic, sas, tow, modular bumper, lux) has been scheduled for 3/22. I haven’t received anything from ford and the back door link still just shows ordering with dealer.
7/31 res, ordered July of last year and re-ordered in October due to being pushed to 22.
It's possible that my build got bumped. I had made changes to my order on 12/29 and dropped the mod bumper and tow package. The sales manager said nothing about my order, I would have assumed he would have told me then.. dunnoOK, yeah, that makes sense. That scheduling (February builds) took place many weeks ago.
Emails, if they come, are nearly a month or more behind the actual scheduling actions taking place.
I think it concerns the last edit that was made to the order. For example, I ordered 10/13, but changed to a soft top on 11/29, and I noticed that my tracker shows 11/29, but there's no way that's a separate order. Probably just a bug in the system. Or my dealer is highly stupid and made a fresh order for every edit.Does anyone know where the Order Confirmed date comes from? Got my VIN last Thursday but it says my order was confirmed on 12/05
it's always changing depending on what is in stock as far as parts are concerned. some people are still waiting for the MY21 orders. Others have gotten pushed through and built on time. On average it can take 4-6weeks after the build date for your bronco to arrive at the dealer. quicker the close you are to the Michigan plant.How accurate are the build dates and how long after the build date does it take to get your bronco?
Thanks
I did the same, no production or VIN showing online but inquiring with my salesperson got me my VIN and production date. Fired up.Bug your dealer to actually look at your order. I had to with my dealer last Thursday and that’s when he discovered i had a VIN, along with several others. If i didn’t make the call, he wouldn’t have found out.