- Joined
- Aug 29, 2022
- Threads
- 16
- Messages
- 98
- Reaction score
- 61
- Location
- Austin, TX
- Vehicle(s)
- '23 Badlands SAS, 2017 Lexus RX350 F-Sport
- Your Bronco Model
- Badlands
- Thread starter
- #1
So I ordered my Bronco June 21' and just now received my "Scheduled for Production" email for week of 12/5 of 22'. This is about 2 week after converting it to a 23' on a side note. Anyways, I'm trying to get my financing plan hashed out so as to get the lowest rate available before the feds raise interest rates again. I can get a 60-day lock through my credit union which would lock me through the end of December but am unsure if I'll actually get it before then! The last thing I want is to have to re-apply for the loan because my locked time ran out (another hard hit on credit). Therefore, how long did ya'll take to take delivery once it has been built? Just curious...
23' Badlands, 2.7, Squatch, Lux, soft top, towing, Hot Pepper Red
Austin, TX
Before anyone even asks, the current rate from my credit union is 4.49% and it gives me the hives just thinking about that going up even more!
23' Badlands, 2.7, Squatch, Lux, soft top, towing, Hot Pepper Red
Austin, TX
Before anyone even asks, the current rate from my credit union is 4.49% and it gives me the hives just thinking about that going up even more!
Sponsored