Is my build date likely to get pushed back again from Sept 20th if it’s a cleanup week since I have a 2 door big bend?
Sponsored
I believe the reservations were extremely high the first few days then tail off significantly.Is there a way to find out updated reservation stats?
So have you seen any updated Take Rate %’s for hard top vs soft top?
If they received 7,800 reservations per day the first few weeks and I’m a day 10 reservation holder then I could be roughly 78k in line with no other factors considered. Originally only 5% of people wanted soft tops. I’m wondering what this has actually changed to.
Say it’s now 50%. Thats 39k Broncos in front of me - 7k FEs = 32k Broncos (Not considering what has already been built outside of FEs. To be conservative)
If they make 500 / day I would need (32k/500=64 Build days or (12) 5 day production weeks in order for be to get a 2021. I think that there’s a chance….??
My Order: 4 door Badlands, soft top, 2.7, Sas, Tow with Mod bumper.
I’m just trying to calculate my odds. Just fun to think about. Does this make sense? Please shoot holes in it.
Sorry, just ran out of AMB this morning. Seriously hoping that you get it!!!!I’m Over here that I’ll hear something.
I originally had an order with many constraints. The other week I changed to OB soft top with 4.27 locker and high package. Now, no constraints whatsoever. I want my AMB color! I don’t want to settle for any of the others since my 2nd choice would’ve been Rapid Red.
Sorry, just ran out of AMB this morning. Seriously hoping that you get it!!!!I’m Over here that I’ll hear something.
I originally had an order with many constraints. The other week I changed to OB soft top with 4.27 locker and high package. Now, no constraints whatsoever. I want my AMB color! I don’t want to settle for any of the others since my 2nd choice would’ve been Rapid Red.
I really wish that there was a thread showing why people got banned. I've been on a few forums that had locked threads, and it was easy to keep track of temporary bans.I'm just going to reuse this gif every week until I get scheduled.
Negative, Escape is built in Louisville. Maverick + Bronco Sport in Hermosillo, MX.THANKS @Administrator
Maverick, Escape and Sport = all the same plant , right?
No scheduling.
Going deep on Transits, Mustangs, and Mach-E!
I also made changes to try to get my AMBSorry, just ran out of AMB this morning. Seriously hoping that you get it!!!!
LOLWhat is the average shipping time for built broncos??