Clearly, we have seen from the video that Sasquatch has to drive each and every Man-Squatch personally from an undisclosed location in the Pacific Northwest.
Sponsored
It’s the time required to get the 2.7L certified with the 7mt transmission![]()
I dont want a 2.7...can I get mine on schedule then?
We're all being a little facetious here right?You’ll take it and be happy, or else!
I wasnt. F the 2.7We're all being a little facetious here right?
The Mansquatch (and any associated delay) has nothing to do with the 2.7L. That engine and transmission combo is still not being made available. The delay for the Mansquatch is very specifically for the 2.3L because it doesn't exist with the 2.7L.I wasnt. F the 2.7
Poor ChewyClearly, we have seen from the video that Sasquatch has to drive each and every Man-Squatch personally from an undisclosed location in the Pacific Northwest.
![]()
GOOD. This I knew. Why a delay for mansquatch at all? No new parts are needed for that config. And only myself and 5 other people even want it...so what gives? I don't even want velocity blue...I just said that in other threads as an example.The Mansquatch (and any associated delay) has nothing to do with the 2.7L. That engine and transmission combo is still not being made available. The delay for the Mansquatch is very specifically for the 2.3L because it doesn't exist with the 2.7L.
That doesn’t answer the reason for the delay.The Mansquatch (and any associated delay) has nothing to do with the 2.7L. That engine and transmission combo is still not being made available. The delay for the Mansquatch is very specifically for the 2.3L because it doesn't exist with the 2.7L.
I never said it did...That doesn’t answer the reason for the delay.
Maybe a shortage of Chinese man-tran
A problem is that Feb/March is when Ford will tell us the expected build date for your order will begin. That is months after December when you have to choose the specifics for your build Order. Would be nice if when we sit down to place the build order we could know build date vs specific packages ordered.......
There's alot of overlap there. Cost and timeframe determine choice.
I really like that combo. I know they said Mansquatch delayed but I think it’s the manual transmission On a BL that is the delay. So I am thinking any manual transmission equipped Bronco will have the delay. Sasquatch has been planned for every trim level from the start. Only recently has manual been offered with all trim levels.Basically why I'm just gonna get a Badlands Manual with a stick and beadlock wheel option and not be bothered with Sasquatch
Makes no sense that that combo gets built any sooner...unless Goodyear can't keep up w/production...in which case I would prefer bfg kms. Wish they had a choice!Basically why I'm just gonna get a Badlands Manual with a stick and beadlock wheel option and not be bothered with Sasquatch
There wasn't a shortage before mansquatch. Why now?That doesn’t answer the reason for the delay.
Maybe a shortage of Chinese man-tran