Perhaps. I of course would sincerely hope not for their sake. Absolute gut punch.Do we think that some early Reservation Holders missed an early build date because they were in the 41% of not build-able Broncos ??? I do.
Sponsored
Perhaps. I of course would sincerely hope not for their sake. Absolute gut punch.Do we think that some early Reservation Holders missed an early build date because they were in the 41% of not build-able Broncos ??? I do.
Hmmm I switched from mod top to mic and didnāt get updated DORA from Granger. Maybe I shouldāve but I have faith in the Granger process.Yeah but you had to go in to get both your pricing sheet and DORA 6 weeks after the order conversion deadline. My dealer sent that to me and signed it before the conversion date which is what I would have expected.
I am a code 13...
.what the hell.does that mean?
What I'm loath to do is call my dealer and make a rukus about changing priority codes on my order based on one email someone posted on a forum, and 10 pages of subsequent guesswork. Flipping and flopping between the original Ford plan that you need a code 19, even if you are:There really isnāt enough information or context in what was shared by the OP to know whether this is the case or not.
They state that orders would āhave to be cancelledā but then they prefaced that by saying the dealers have to go in case-by-case, and then they conclude by saying that Ford wont be doing something going forward.
Basically, we know that if you have a MY22 option, you should be coded 99 to avoid all problemsā¦ if you arenāt coded 99ā¦ I donāt think we can say with any level or certainty what the consequences will be.
Sell your Bronco? What is the matter with you? You canāt sell it. Thatās like asking for Thor to come down and hit you with a lightning bolt.Perfect. This just means if I end up wanting to sell my 2-door because I feel it's too small, I'll get top dollar for it.
Define "a bit longer"I am surprised after waiting so long for a Bronco, that people would sacrifice getting exactly what they want, just to get it a few months quicker. I guess to be first on the block?
Iāll waIt a bit longer and get the build Iāve been waiting for.
NO, both dealers emailed me the DORA sheet before the order banks closed. I went to the dealer in my own this week just to get a signed price sheet for my own piece of mind.. They asked me to review and sign the Dora at that time. Too late for changes anyway since I'm already scheduled for June production.Yeah but you had to go in to get both your pricing sheet and DORA 6 weeks after the order conversion deadline. My dealer sent that to me and signed it before the conversion date which is what I would have expected.
HYCould this be people who know they were being pushed to MY22 bc of the top they ordered and did nothing as we assumed you would automatically get get pushed MY22?
HYCould this be people who know they were being pushed to MY22 bc of the top they ordered and did nothing as we assumed you would automatically get get pushed MY22?
I communicated with my dealer about this last night. This will affect anyone ordering the painted modular top or MOD/Soft top combo that did not change to a 99 build code and defer to MY22. They are at risk of losing their time stamp and having their order canceled altogether by Ford.HY
YES I KNOW AND i have timestamp reservation 2020-07-23 + DORA AND CONFIRMATION FROM FORD FOR MY BUILT + price below MSRP + no allocation system in canada+ all paper sing by the owner of DALTON FORD dealer,he said i will be automaticly pushed in early 2022 when dual mod top will be available and maybe i try to change color from shadow black to white top. i do'nt find any problem i can read on this thread. what's the real problem here?
explain me please....
TRACKTOY