That is interesting, I have a 1/26 date on mine as well, I couldnt tell you what it said before just now, but I am blend 1/24 for what it's worth.The date at the bottom of my window sticker changed from 01/19/2022 to 1/26/2022 this morning. I check it several times a day and it had been stuck on the 19th every day since I first was able to get a window sticker. Is this a sign or no?
Hey good catch! Mine now says 1/25/22.The date at the bottom of my window sticker changed from 01/19/2022 to 1/26/2022 this morning. I check it several times a day and it had been stuck on the 19th every day since I first was able to get a window sticker. Is this a sign or no?
Mine still shows 1/20 on the sticker. I wonder if the date is updated once your Bronco is on the line.Mine too! What does it mean? What does it mean?
My original sticker said 1/18, today says 1/25. 1/24 is my blend date. No module data yet but I check several times every 15 minutes lol.Mine changed to 1/26 too (blend date 1/25) I wish I saved my old sticker to see if anything changed
I found mine on the very very bottom of the page in the white border. The date under my "SPECIAL ORDER" block is still 1/18/22.Mine still shows 1/20 on the sticker. I wonder if the date is updated once your Bronco is on the line.
If I were to guess it would be that this means your true blend is probably tomorrow with mods popping tomorrow night or Fri morning. I think the original claim that we're two days behind has become the reality. That said, if they work shift through Sat I see no reason why all of us won't be built (less any chip shortage) by the weekend.My original sticker said 1/18, today says 1/25. 1/24 is my blend date. No module data yet but I check several times every 15 minutes lol.
Sounds right to me. Only thing I can see being different is that some with the 1/24 had modules popping this morning and they are a couple hundred ahead of me on the daily count. So maybe it might happen today. I’m more concerned with the rumored chip hold once built to delay shipping. Just think how bored we will be once we are all driving our broncos.If I were to guess it would be that this means your true blend is probably tomorrow with mods popping tomorrow night or Fri morning. I think the original claim that we're two days behind has become the reality. That said, if they work shift through Sat I see no reason why all of us won't be built (less any chip shortage) by the weekend.
For people with blend date of 1/29, if they are the ending numbers in the daily allotment, they wont be finished until the following Monday because is takes 1.5 shifts to build. If its a later number they they start during the Saturday night shift, the second half shift is Monday.If I were to guess it would be that this means your true blend is probably tomorrow with mods popping tomorrow night or Fri morning. I think the original claim that we're two days behind has become the reality. That said, if they work shift through Sat I see no reason why all of us won't be built (less any chip shortage) by the weekend.