Following my mods popping last night, everything else updated for me this morning: tear tag to NDZ2, pizza tracker to built and an estimated delivery date of 1/22 (which seems quick).Mods just popped. No change on pizza tracker.
Sponsored
Following my mods popping last night, everything else updated for me this morning: tear tag to NDZ2, pizza tracker to built and an estimated delivery date of 1/22 (which seems quick).Mods just popped. No change on pizza tracker.
Mine is EG… and no updates this morningI think they may have run out of Eruption green paint. 6 of the 11 broncos on the spreadsheet with no mods yet are EG.
I’m in the same boat….no movement…is it the tow package, MIC roof or maybe leather seats???? Who knows…..Nope. You, me and Baconator are in a race until the end.
I bet your number will be up soon. I went to bed mad because I was one of the remaining few with no update and woke up to mods popped and about 9am got a built status and ETD of 1/20-1/26. Looks like we have the same bronco except for the leather seats. I had 4DR, area 51, MIC, Tow, SAS, Lux, but no leather. Don't worry it will happen soon!I’m in the same boat….no movement…is it the tow package, MIC roof or maybe leather seats???? Who knows…..
@BadSquatch21I will let CSN sum it up for me...
Helplessly hoping
My disassembled Bronco nearby
Awaiting a word
Gasping at glimpses
Of gentle true trackers
He runs, wishing he could drive
Don't think so ... I have all those tow, MIC, and leather and got built ... still waiting for shipmentI’m in the same boat….no movement…is it the tow package, MIC roof or maybe leather seats???? Who knows…..
Movement is good sign. I still don't get the tear tag deal. Some change, some don't. I went into production with no change.@BadSquatch21
@Ford Motor Company must have felt bad for me after seeing these lyrics!!!
Tear Tag changed to LCW3 (no modules yet)
Tracker shows In Production WITH A DATE 01/05/2022
So the tear tag updated this morning to LCW3, but no modules are populated. Wonder what that means?
Following my mods popping last night, everything else updated for me this morning: tear tag to NDZ2, pizza tracker to built and an estimated delivery date of 1/22 (which seems quick).
My pizza tracker shows built on 1/5 and the tear tag changed to NVS2 but no mods popping yet. Est delivery 1/26.
From what I understand from what I surmised in an earlier post (https://www.bronco6g.com/forum/threads/-12-20-21-build-week-group.26928/post-1090071), the first three characters are the "software family" and the last digit is the version, so it should be "the same" grouping of all 4 for each similar build... But, over time, we may notice increments in the version, which would indicate they made a software change on the line between build batches. This may be somewhat useful to know what's going on and help us to check for updates to firmware out in the field.Movement is good sign. I still don't get the tear tag deal. Some change, some don't. I went into production with no change.