logged in to the tracker this morning, and I am "In Production 3/14/23"Congrats! That’s awesome.
Sponsored
logged in to the tracker this morning, and I am "In Production 3/14/23"Congrats! That’s awesome.
same here.I moved from 4/3 to 3/20
Everybody seems to be shifting around, but mine (backdoor and tracker) says 4/17. If it still says that next week, I will be suspecting that I am indeed scheduled for Monday.This is double posted, but thought I would put this pattern out there that a few of us have been noticing.
Well I actually am still a 3/20/23 build week. This seems to be how it works. You get assigned a tentative build week first, mine was 4/3/23. Then you may or not get bumped around week to week. Eventually you get assigned to a specific day of a build week for me it was 3/21/23. Then a week before that day it appears they put you in production, for me it was 3/14/23 that is what causes the confusion. Within 24 hours or so after going into "production" you receive your window sticker. Mine had a blend date of 3/21/23, which aligns with that specific build week date that was displayed in the tracker. So when you see a specific day of the week vs the first day, that is likely where you are penciled in. So pay attention to date changes. Sucks if you are assigned that first week day though, because you can't recognize the pattern until you go to production.
If you stay 4/17 and I stay 4/18 we can be assembly line besties!Everybody seems to be shifting around, but mine (backdoor and tracker) says 4/17. If it still says that next week, I will be suspecting that I am indeed scheduled for Monday.
That’s a better direction than me!Just entered in my data. Was bumped from 4/10 Build Week. Grange-tober reservation holder. 2-dr VB OBX High
From my past experience with my current Bronco, I was bumped back a few weeks. Then there was one final bump up 2 weeks and it held. Seems as if/when a build week gets bumped up that it holds.That’s a better direction than me!
Ok, I’ll switch with you, I’d prefer a mid May or early June.From my past experience with my current Bronco, I was bumped back a few weeks. Then there was one final bump up 2 weeks and it held. Seems as if/when a build week gets bumped up that it holds.
I was actually hoping for a later build week. Best case scenario that it gets built and promptly delivered means that I won't be able to take delivery right away. I've made plans to attend SCE and won't be able to make the drive to Granger until mid-May. Would have preferred a June delivery.
Updated here too. Scheduled "week of" the 4th